In this analysis we developed and applied a geographically-resolved method to calculate the Levelized Cost of Electricity (LCOE) of new power plants on a county-by-county basis while including estimates of some environmental externalities. We calculated the LCOE for each county of the contiguous United States for 12 power plant technologies. The minimum LCOE option for each county varies based on local conditions, capital and fuel costs, environmental externalities, and resource availability. We considered ten scenarios that vary input assumptions. We present the results in a map format to facilitate comparisons by fuel, technology, and location.