Australia’s first big grid-connected solar-storage plant pioneers ‘islanding’

News

“The first large-scale solar and battery storage project to be connected to the grid in Australia has started providing power to 3,000 homes and businesses in Far North Queensland (FNQ) while forming a test case for deliberate ‘islanding’.

Conergy’s AU$42.5 million (US$33.6 million) project includes a 10.8MW(AC) solar farm with more than 40,000 solar panels alongside a 1.4MW / 5.3MWh lithium-ion battery.

It will be a test case for deliberate ‘islanding’, where a section of the grid continues to provide power while disconnected from the main grid.  This capability will increase the reliability of local supply and pave the way for other fringe of the grid locations.

For this testing, the remote town of Lakeland will be solely powered by solar and batteries for several hours at a time as a form of protection against blackouts. ”

Click here to read more

, , , , ,

Related Posts