- The Port of Los Angeles will be the site of a solar+storage pilot program which aims to show how carbon-free energy solutions can help make marine terminal operations more efficient and have less environmental impact, PV Magazine reports.
- The $27 million project includes a 1 MW rooftop solar array, 2.6 MWh battery system and a number of electric vehicles and cargo handling equipment that will be integrated into the Port’s operations.
- Burns & McDonnell was selected to provide the engineering and overall project management services for the Green Omni Terminal Demonstration Project.
Read more about the project from Utility Dive.