East Bay Community Energy Critical Municipal Facilities

EBCE assessed all the critical facilities in their territory to see what potential was there for solar storage. This initiative was funded by a Air Resources Board (ARB) grant and allowed them to look at over 300 facilities, which were shared by the cities they cater to. Consultant Independent Engineers (IE) completed a preliminary review of the facility portfolio to confirm the most technically viable solar + BES sites and eliminated sites that had complex roof configurations/attributes or significant shading. EBCE then developed a standard PPA, signed by them and not the local jurisdiction to be intermediary between City and developer. A centralized convener like a CCA can really help fill gaps in bandwidth for member cities that don’t have time and allows CCAs to fund projects that previously cities weren’t able to.