Priority Area: Clean Energy and Building Decarbonization
Barrier: Interconnection and Energization

Challenge/Local/State

Description

State Solution
(Type of Activity: Policy/Planning/Land Use )

Construct long-term system and transmission planning.

Existing Examples of Progress: IEPR and SB 100
Further Progress Pathways: CEC IEPR and SB 100 Reports: The California Energy Commission (CEC) addresses grid interconnection in its ongoing 2025 Integrated Energy Policy Report (IEPR) and the SB 100 Joint Agency Reports, recognizing it as a critical bottleneck and key factor for reliably achieving 100% clean energy, working with the CAISO and CPUC on planning and addressing transmission/interconnection challenges for renewable and storage buildouts.
Region: Statewide

Do you have any feedback on this item?

If you have examples of examples and best practices, some pathways for progress on these issues or feedback or additional details on the item please let us know so that we can add to our knowledge base!

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.