Redwood Coast Airport Microgrid

Redwood Coast Energy Authority is partnering with the Schatz Energy Research Center (SERC) at Humboldt State University, PG&E, and the County of Humboldt to build a 7-acre, 2.25 MW solar array and battery energy storage system at the California Redwood Coast – Humboldt County Airport (ACV). The County will house the airport microgrid, RCEA will own and operate the solar and battery systems, PG&E will operate the microgrid circuit, and SERC will be the prime contractor responsible for the project design and technology integration.